1st day of bridge testing
Completion requirements
Supplies: You'll need 4 sheets of paper, 2 history or math books, a batch of pennies and 3 dominoes.
Work thru this geometry activity and put your data and drawings in a google doc to be shared with me.
- Include a sketch of each of your 5 bridges on your doc (Insert, drawing allows you to do this.
- Tell how many grams each bridge held before it collapsed.
- Tell what the terms tension and compression mean related to beams of buildings and bridges.
What to do: Google images of types of bridges and build these:
1. Beam 2.truss 3. single arch beneath the road, and 4. double arch bridge
5. Combo truss and single arch.
Leave a 6" gap between the books that support your road/bridge. The books represent the piers that support the bridge. Load pennies on one at a time until the road gives way. Include the grams held by each bridge in your google doc.
Last modified: Sunday, 5 January 2025, 2:28 PM